You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Kalibaru Masuki Tahap Finishing

Normalization on Kalibaru PHB Channel has Entered Final Phase

Normalization on Kalibaru connecting (PHB) channel, Kemayoran, Central Jakarta has entered final phase. Channel which located between Utan Panjang Urban Village and Kebun Kosong Urban Village is fully normalized as long as 700 meters.

PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan informed, Kalibaru PHB channel that has 700 meters long will be repaired by full normalization.

"PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others," he said after summit meeting (rapim), Tuesday (10/3).

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

He hopes Kalibaru PHB channel could be functioned well after normalization. Thus there will be no inundation along the channel.

"We also normalize water channels in settlement along Jl. Kalibaru Barat," he closed.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye809 personTiyo Surya Sakti
  2. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye720 personNurito
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye708 personDessy Suciati
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye647 personTiyo Surya Sakti
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye452 personDessy Suciati